Hi,
One of our client uses IBP 3.0.2.2 On-Premise system, wanted to know if the key figures that are supported in IBP4 for supply planning operator can be used as Key Figures in IBP3.0.2 on-premise system?
E.g. sub period of supply, will the supply planning algorithm be added in On premise system?
Regards,
Aditya